Quality is designed in,
then proven

We measure, document and repeat.

Design for Manufacturability (DFM)
Early review of drawings, connectors, materials and tolerances to reduce risk and cost.
Outcome: Approved build plan and acceptance criteria
Materials & Compliance
Sensible, available materials with clear substitutions. RoHS/REACH‑aware materials on request.
 Outcome: Confidence in supply and conformance.
Workmanship Standard
We build to IPC‑WHMA‑A‑620 Class 3 workmanship where specified.
Outcome: Consistent, inspectable results.
Testing & Inspection
  • Environmental chamber testing (thermal & humidity cycling)
  • Electrical testing with bidirectional supplies (under load)
  • Video microscopy & cross‑sections for joints and crimps
  • Pull‑test sampling for harness terminations
  • Functional tests for integrated electronics and box builds
  • Final system-level verification before shipment
Outcome: Evidence that the assembly meets its purpose.
Documentation & Traceability
ERP‑linked travellers, serialisation, and label data from raw materials to shipment.
Outcome: Clear history for every unit.

Ready to start building?

Send drawings or a brief. We’ll reply within one working day (Taipei time).